Zero ppm within reach: Quality control in the BOA production of mini bellows

Quality Management – The BOA Group facility Stutensee successfully implemented a 100% quality control in the production process of mini bellows (Automotive Division).

Statistical Process Control

A camera system observes all characteristics that need to be checked during the production via the connected CAQ module SPC (Statistical Process Control).
The bellows are measured and the data is sent to the SPC system every 15 seconds. The measuring values are transferred into the inspection order automatically, are graphically illustrated and evaluated.

If the system notices a violation of the so called action limit, an automatically created message will be sent immediately via email to a linked computer or mobile. Thus an intermediate launching of predefined corrective measures is possible – in
terms of error prevention and the 0 ppm philosophy.